- Completed (2023)
Gilmore Development

System Used
Sump & Sewage Pump System
Address
Burnaby, British Columbia
Sump & Sewage System
In 2023, Albany Water Systems supplied a custom-engineered sump and sewage pump system for the Gilmore Development project in Burnaby, British Columbia. The system was designed to manage both stormwater and sanitary drainage from the multi-level underground parking areas, ensuring flood protection, operational reliability, and ease of maintenance for this large-scale mixed-use development.
System Overview
- Duplex submersible sewage pump system with automatic alternation and overload protection
- Simplex sump pump system for stormwater and foundation drainage
- Heavy-duty basins with guide rail assemblies, quick-disconnect fittings, and sealed covers
- UL/ULC-listed control panels with Hand-Off-Auto switches, indicator lights, and audible/visual alarm signals
- Dry alarm contacts for Building Automation System (BAS) integration
- Check and isolation valves pre-mounted on common discharge headers for simplified maintenance
- Aluminum access hatches supplied for all pits, providing safe and durable service access
- Factory-assembled and fully tested systems ensuring efficient installation and reliable operation
Performance & Functionality
The system provides automatic stormwater and sewage removal from below-grade levels, maintaining dry and secure conditions throughout the facility. Alternation controls balance pump runtimes, while high-level alarms provide early warnings, minimizing the risk of flooding and downtime.
Project Outcome
The Gilmore Development sump and sewage system delivers robust and long-lasting performance, supporting the building’s critical drainage infrastructure and meeting municipal and environmental standards.
- Project Images